Professional Scrum Master II

Questions Block 16

1. Currently, your engineering department is organized in siloed teams that specialize by function (for example, design, front-end, back-end, database, and testing).
What would you consider when moving away from component teams towards feature teams?
2. Part of the team’s Definition of “Done” requires creating or updating technical documentation in order to maintain the product and/or features in the future. The team’s technical writer will be on vacation during the Sprint.
What should you do?
3. Kevin is a senior developer that has recently joined an existing Scrum Team. The existing team members are unable to get along with Kevin and conclude that he is not a culture fit.
If necessary, who is responsible for removing the new team member, and why?
4. A cross-functional Development Team is defined as:
5. Who should manage the tasks of Development Team during the Sprint?
6. Who must ensure that the work done for a Product Backlog item conforms to the Definition of “Done?”
7. A key concern when multiple Development Teams are working for the same Product Backlog is minimizing dependencies between teams.
8. The Scrum Master is no longer needed when teams become self-organized.
9. What Product Owner activities occur between the end of the current Sprint and the beginning of the next Sprint?
10. What factors are best considered when defining the Sprint length?